Car park recieves rainwater attenuation
Project
Car park of Fürst-Stirum-Klinik / Germany / 2019
Application
Rainwater attenuation
Products
DRAINMAX tunnel
Planning
Number of DM tunnels | 12 x DM-T/60 double row in unglued foil jacket 1 x D100-10 |
Required attenuation volume | 27,6m³ |
Porous volume backfill material | 35% |
Ground area for infiltration system | 58 m² (3, 7 m x 15,5 m) |
Requirement for traffic load | SLW30 |
Description
The new multi-storey car park of the RKH Fürst-Stirum-Klinik in the Gutleutstraße in Bruchsal will offer 265 parking spaces for patients and visitors.
As a supporting measure to retain rainwater, 12 high-stress DRAINMAX tunnels were laid on a surface area of around 58 m².
The client's decision to opt for a retention solution using the DRAINMAX tunnels was based on the good and reliable cooperation with INTEWA, which he has already experienced in previous projects.