Logistics Center Großbeeren infiltrates rainwater
Project
Logistics Centrum Großbeeren Commercial park in Lilograben / Germany / 2016
Application
Stormwater infiltration
Products
DRAINMAX tunnel
Planning
Number of DM tunnels | 460 x DM‐T‐1600‐M/60 12 x S‐F‐DN2500‐ DN300 |
Required retention volume | ca. 1.400 m³ |
Pore volume of fill material | 33% (Gravel 16/32) |
Coefficient of permeability | 3,7x 10‐5 m/s |
Area | ‐‐‐ |
Requirement for traffic load | SLW30 |
Description
Since August 2016, a new 19.900 m² logistics property has been available at this important logistics hub in the south of Berlin. Rainwater infiltration was a component of the approval. The
required infiltration volume was installed as a trough‐trench system with 240 m² DRAINMAX volume as well as a further extensive 1,150 m³ DRAINMAX tunnel‐trench systems. The specialized requirements for pre‐cleaning according to DWA M‐153 were ensured by INTEWA sedimentation and filter shafts.