Perfect solution for tight spaces
Project
Olympic Village / Berlin / Germany / 2018
Application
Fire water supply
Products
GRP fire water tank
Planning
Number of GRP tanks | 1 |
Storage volume | 100 m³ |
Load class | SLW30 |
Others | horizontal swivelling of the extraction pipe by approx. 6 m |
Description
The Olympic Village Berlin, which was created in 1936 for the athletes of the various nations who took part in the Summer Olympics, is now a listed building. As the oldest Olympic Village in the world, it is a popular attraction for tourists. In 2017, the site and its buildings became the property of terraplan Immobilien- und Treuhand GmbH, which is developing a location for exclusive living there in compliance with the protection of historic monuments. The supply of fire-fighting water is ensured here by means of a 100 cubic metre GRP fire-fighting water tank from INTEWA, which is the perfect solution under the extremely cramped space conditions and was able to convince with its excellent quality.